LNG Feasibility Study

iEPC led a feasibility study for Ascendant Group for the importation, storage and regassification of LNG for power generation in Bermuda in conjunction with consultants Leidos and CH-IV. This study included identification of the import terminal, review of exclusion zones, preliminary design of storage, pipeline and power generation options.